| Availability: | |
|---|---|
| Quantity: | |
(former CSD3000)


Features
●Crawler mounted design;
●4 speeds gear box ;
●Big chuck diameter up to 117mm;
●Independent hydraulic leveling jacks;
●Drill head has sliding function ;
●Telescopic mast;
●Mast has dump function;
●The rod collection support with capacity of 200x9m(NS rod) in the middle part of the mast;
● Independent hydraulic cooling system;
●Premium hydraulic components of European/US origin。
After Sales Service
Our expert service engineer team is globally available, 24/7.
Note
Rigs are available with different mounting options and diesel or electric drive options. Please contact sales@cortechdrilling.com for more information.
Technical Parameter:
Drilling Capacity | |
Dia of Drill Rod | BS 、NS 、HS 、PS |
Drilling Depth | 3,000m 2,300m 1,600m 1,050m |
Engine | |
Model | Cummins 6LTAA8.9-C325 |
Type | Turbo |
Power | 239KW |
RPM | 2,200rpm |
Drill Head | |
Max Torque | 8,170Nm |
Max Rotation | 1,150rpm |
Feed Stroke | 3,450mm |
Max Inside Diameter | 117mm |
Pull/Push | 250KN/90KN |
Main Winch | |
Max Pull | 185KN |
Pulling Speed | 25m/min(low),60m/min(high) |
Rope Diameter | 24mm |
Rope Length | 40m |
Wireline Winch | |
Max Pull | 18KN(bare drum) |
Pulling Speed | 120m/min(bare drum) |
Rope Diameter | 6.6mm |
Rope Length | 2,500m |
Mast | |
Length | 11.2-13.7m |
Drilling Angle | 45°~90° |
Dump Length | 1.4m |
Foot Clamp | |
Drill Rod | BS, NS, HS, PS |
Travelling Capacity | |
Max. Permissible Gradient | 30° |
Max. Travelling Speed | 2km/h |
Transporting Dimensions | |
L*W*H | 11,240×2,310×3,330mm |
Total Weight | |
Total Weight | 23.5t |
Top Core Drilling Rig Manufacturers and Suppliers in Philippines
Top Core Drilling Rig Manufacturers and Suppliers in Indonesia
Top Core Drilling Rig Manufacturers and Suppliers in Malaysia
Top Core Drilling Rig Manufacturers and Suppliers in Myanmar
Top Core Drilling Rig Manufacturers and Suppliers in Vietnam
Drill Bit Re-sharpening vs. Replacement: Economic Thresholds for Drillers
Modular Drilling Rigs vs. One-Piece Rigs: Logistics and Assembly Time